Virtual Public Meeting Lake Chetek Bridge Project

  • Lake Chetek Bridge:
  • Place a 1 ½-inch concrete overlay on the bridge deck
  • Rehabilitate the concrete sidewalk, piers and parapets
  • Make joint repairs
  • Clean drainage grates
  • Paint bridge girders

 

  •        Roadway (On both sides of the bridge):

o   Remove 2 inches of the existing asphalt pavement and place 2 inches of new hot-mix asphalt pavement

o   Replace curb, gutter and sidewalk

o   Restore the landscape

During construction, County D will be closed to traffic at the bridge, and motorists will be detoured via County M, US 8 and County SS. In addition, temporary accommodations will be made for pedestrians.